Skip to content
System Check: OSP/ISP Ready
0%
Fiber Guys LLC

Services

Two things. Done exceptionally well.

We don't try to be everything to everyone. We place fiber and we splice fiber — and we do both at a level that closes out clean.

01

Fiber Jetting

High-output placement built for long runs and consistent results.

Our jetting crews specialize in production-scale fiber placement through conduit systems of all sizes. From single-duct metro runs to multi-path campus distributions, we deliver cable safely, efficiently, and on schedule. Every run is monitored for tension and pressure to protect cable integrity from start to finish.

View Full Details

Capabilities

  • Production-grade jetting equipment for runs up to 15,000+ feet
  • Pre-jet conduit inspection and pathway verification
  • Real-time tension monitoring during placement
  • Multi-count cable handling from 12 to 864 fibers
  • Tight bend radius navigation without cable damage
  • Coordinated reel staging and logistics planning
02

Fiber Splicing

Clean trays, clear labeling, and organized closures ready for handoff.

Precision matters when fibers meet. Our splicing teams deliver consistently low-loss fusion splices with organized tray routing, permanent labeling, and clean enclosures on every job. When we hand off a splice, it's ready for the next crew or the end client — no callbacks.

View Full Details

Capabilities

  • Core-alignment fusion splicing with ≤0.03dB splice loss standard
  • Ribbon and single-fiber splicing capabilities
  • Clean tray organization with color-coded routing
  • Permanent labeling on every closure and tray
  • High-count splicing up to 864 fibers
  • Organized enclosures ready for client inspection

The Baseline vs. The Standard

What you're used to getting — and what we actually deliver.

Industry Baseline
Fiber Guys Standard
Messy Splice Trays
Organized & Labeled Trays
Delayed Test Results
OTDR Data Ready at Handoff
Missing As-Builts
Clean Closeout Packages
Surprised by Scope Changes
Pre-Deployment Scope Verification
Generic Crew Assignments
Task-Matched Equipment & Personnel
Unclear Documentation
Geo-Tagged Photos & Splice Maps

The Proof

Audit-Ready Handoffs

Data built for the prime contractor.

We don't just leave you with a physical build; we hand over the exact data you need for seamless internal tracking and prime contractor invoicing. Our closeout packages are formatted, verified, and ready for submission the moment we step off site.

  • Geo-tagged As-Builts & Splice Maps
  • End-to-End OTDR Traces (.sor & PDF)
  • Clean Redline Markup
closeout_pkg
5 items
~/projects/metro_east_144ct/closeout
.pdfroute_redlines_v2.pdf
4.2 MB
.sorOTDR_Trace_Span4.sor
1.8 MB
.pdfsplice_map_144ct.pdf
2.1 MB
.ziptray_photos_144ct.zip
38.6 MB
.dwgas_built_route_7.dwg
6.4 MB
All files verified
53.1 MB total
Verified Closeout

Ready to get started?

Send us your prints and project details. We'll get back to you with crew availability.